Estimating fundamentals
Construction estimating fundamentals: a UK guide.
Every construction estimate starts with a method. This guide explains the main approaches, when each is appropriate, and how they relate to your project type and stage.
Key estimating methods
The right estimating method depends on the information available and the stage of the project. Early-stage estimates use broader methods; detailed construction requires more precise approaches.
Related free tools
Try the Construction Estimator or Budget Estimate generator to create draft documents from your own figures.